Category

FLOOR MOUNTED PEDESTAL Regular price$288.00

$288.00

FLOOR MOUNTED PEDESTAL

The floow mounted pedestal is an ideal solution for tight spaces requiring high efficiency use of space. It supports a multitude of AC and DC charger models that can be mounted on this pedestal; in the absence of a wall mounting option.

Share:

How long does it take to charge an Electric Vehicle (EV)?
AC Charging Station: 4 to 8 hours
DC Fast Charger: 30 mins to 1 hour

How much does it cost to charge an EV in Singapore?
The average cost of charging is approximately 50 Singapore Cents per kWh.
Assuming the Electric Vehicle has a 50 kWh battery capacity.
Charging your EV from 10% to 100%, it would amount to a total of 45kWh x $0.50 = $22.50.

How do I know if the charger is compatible with my EV?
There are two types of common charging connectors, Type 1 & Type 2.
Type 2 connector is commonly used in AC charging whereas the CCS2 connector is commonly used for DC charging.
*** Note: Some older Japanese EVs such such as Nissan Leaf utilize the CHAdeMO connector.

Are outdoor EV chargers safe to use during rain and in lightning and adverse weather conditions?
The short answer is ‘Yes”. However, for your own safety, do not operate, commence or disconnect charging terminals during adverse weather conditions.

Power ratings VS EV charging time.
AC charging is limited to EV’s onboard charger to convert AC to DC. Therefore if the onboard AC Charger is only rated at 7kW, even if you use an 11kW AC charger, the battery can only be charged at 7kW.

On the other hand, DC Chargers have the capability of converting the AC to DC current and therefore they are able to deliver a higher current and results in faster charging times.

How do I ascertain if there is sufficient electrical supply in my landed home to charge my EV?
Contact SuperCharge.SG and we will send a team and a Licensed Electrical Worker for a free non-obligatory site inspection.

When will the Smart Charger stop charging?
EVs are designed to automatically stop and/or trickle charge when the batteries reach near full charge to prevent overcharging and prolong battery life.

How many EV chargers can we install?
The EV Common Charger Grant (ECCG) co-funds the installation of smart chargers for up to 1% of residential carpark lots (including visitors and handicapped lots & excludes loading bay); rounded-up to the nearest whole number. 

For example, if there are 70 parking lots in an Non-Landed Private Residence (NLPR, ie condo), 1% of 70 = 0.7, rounded-up to the nearest whole number equals to 1. 1 charger is be eligible for co-funding.

Can we still apply for the grant if we have an existing EV charger?
Yes. However, LTA prioritizes applications of NLPRs without existing EV chargers.

Are EV chargers installed prior to 19 Jul 2021 eligible for the ECCG?
No.

Are mixed-use Private developments eligible for the ECCG?
Yes provided the following criteria are met:
● EV Chargers benefit more than 1 household;
● EV Chargers are for residence’s exclusive use; and
● EV chargers are installed in a location owned and part of the development (e.g. not on state land).

What are the items not eligible for ECCG claims?
Items not directly needed for the installation or operations of a charger are not eligible for the ECCG claims.

These include (but not limited to):

  • Signages
  • Repainting of parking lots
  • Electrical infrastructure upgrades
  • Civil infrastructure
  • Grid connection fees charged by SP Power

How do we apply for the ECCG?
Applications for ECCG is done via the Business Grants Portal (BGP). SuperCharge.SG will assist you every step of the ECCG application.

More information on EV Common Charger Grant (ECCG) is found on LTA’s Website.

Scroll to Top